LaunchFilter

Guides

What to prepare before a Product Hunt launch

Launch day is the visible part. The two weeks before it decide what the day produces: the page, the gallery, the first comment, and the people who already know the launch is coming. Here is the preparation order, and the parts most teams leave to the last night.

Library data as of Nov 23, 2026

1,027
Directories
967
With a public submission form
189
Directories requiring a badge
320
Badge assets documented

Launch day is the visible part; the two weeks before decide it

A launch post is read in a few seconds by someone who has never heard of you, and what they see is the product of preparation: a page that explains the product in one sentence, a gallery that reads without sound, a first comment that answers the questions they would have asked, and a group of people who already know the launch is coming. None of that can be built on the day.

The failure mode is familiar. The team spends the two weeks on the product and the last night on the page. Reverse it. The product will still be imperfect on launch day no matter what; the page does not have to be, and the page is what the audience actually evaluates before it decides whether to try the product.

Preparation has a second benefit that is easy to miss: it forces the product into sentences. Writing the tagline, the description, and the first comment is the cheapest positioning work available, and the sentences you settle on will be reused in every directory listing after the launch.

Week minus two: build the asset pack once

The pack is the same asset pack that directory submissions need, extended for a launch page. Build it once and reuse it everywhere: the page, the social posts, the directory listings, the follow-up email. Teams that rebuild copy per surface end up with five versions of the tagline, and the version the audience remembers is whichever one they saw last.

  • Name, plus a tagline at three lengths for different surfaces.
  • A description of roughly two hundred and forty characters.
  • Five gallery images at one consistent aspect ratio.
  • A logo on a transparent background and a favicon that reads at sixteen pixels.
  • A demo recording under a minute, captioned, with a static poster frame.

Keep every piece in one folder with names a stranger could understand. On launch day you will be copying from it under time pressure, and a file called final-final-v3 is the reason a stale logo ends up on the page.

If a directory asks for a different image size, resize from the master rather than rebuilding the asset. The master file is the source of truth, and every derivative should be traceable back to it.

The tagline is the whole launch in one line

The tagline does more work than any other asset: it is the page title, the social card, and the thing people quote when they tell someone else about you. The test is the same one a directory editor applies, name the outcome and not the category. AI-powered analytics is a category. Answers why signups dropped in one query is an outcome.

Write ten, pick three, and show them to people who do not work on the product. Keep the one they can repeat back to you a day later. A tagline that survives being retold by a stranger is worth more than one that reads well on the page and evaporates in conversation.

Do not test the tagline on your own team. Everyone inside the company already knows what the product does, which makes them the worst judges of whether the sentence explains it. The useful testers are the people who will see the launch for the first time on the day.

Gallery assets: the five images that do the work

The gallery is read in seconds and often without sound, so every image has one job. Image one shows the product doing the main thing, with a caption that states the benefit. Image two shows before and after. Image three is the feature people ask about, with a real example. Image four is social proof with a name attached. Image five is pricing or the launch offer.

Readability rules: text large enough to survive a thumbnail, no dense dashboard screenshots with unreadable labels, and captions that state the outcome rather than the feature name. A gallery that requires a zoom is a gallery that gets skipped, and the visitor who skips it has no reason to keep reading.

The most common gallery mistake is showing the whole interface. A screenshot of everything explains nothing. Crop to the one panel where the change happens, enlarge the text, and let the caption carry the rest.

The first comment is the real landing page

Many visitors read the first comment before they read the description, because the comment is where the founder sounds like a person. The maker comment should answer six things: what it is, who it is for, why you built it, what is different, what it costs, and what you want feedback on. Six short paragraphs, no marketing voice.

Write it in advance and end with the question you actually want answered. Comments that ask a real question get replies; comments that ask for upvotes get ignored or flagged. The first comment is also the place to admit a limitation, because that buys more credibility than another sentence of praise.

Edit it the day before, not the morning of. Reading the comment out loud catches the sentences that sound like a pitch deck, and the version that sounds like a person is the one people reply to.

Hunter logistics: what a hunter does and does not do

A hunter schedules the post and lends their following. That is the whole job. A hunter with a large following in your category can help; a hunter with a large following in a different category mostly does not. If you do not have a hunter, self-hunting is normal and works fine. Do not pay for one, and do not promise anything in exchange for the introduction.

If someone does offer to hunt, ask one question: have they launched or hunted anything in your category? A yes with examples is worth considering. A yes without examples is a favor from a stranger, which is fine to accept and wrong to plan around.

Treat the hunter as a scheduling convenience, not a distribution strategy, and spend the saved effort on the people who will actually read the post. The supporter list you build yourself is the part of the launch you control.

The supporter list: build it before you need it

Two weeks out, write down the people who would genuinely want to know: past colleagues, beta users, people who replied to a build-in-public post, the communities where you participate. Message them individually, tell them the date, and ask them to look at the launch, not to upvote. Asking for a look is honest; asking for a vote is how launches get flagged.

A list of thirty people who actually care beats three hundred who were asked to do a favor. The thirty will read the page, leave a real comment, and tell you what is confusing. The three hundred will click once and leave, and the platform will notice the pattern.

Message them in small batches rather than one broadcast, and keep the message short enough to read on a phone: what you built, the date, one link. If someone replies with a question, answer it before the launch and use the answer to improve the page.

The page itself: every field filled before launch day

The launch page has more fields than most teams expect, and each one is a surface someone reads. Topics matter more than they look, because the topic pages are how people browse after launch day. Pick the two narrowest topics that describe the product, not the ten that describe the market.

FieldWhat good looks like
TaglineOne outcome, no adjectives
DescriptionWho it is for, what it does, what it replaces
TopicsThe two narrowest accurate ones
PricingThe real starting price, free tier stated
GalleryFive images, readable at thumbnail size
First commentWritten and edited before launch day

Fill every field even when it is marked optional. An empty field reads as an unfinished product, and the visitors who notice are the ones who were closest to trying it.

Pricing and the launch offer, decided in advance

Decide the launch offer before the week starts, and make it small enough to keep. A lifetime discount that eats your margin for a year is a bad trade for one day of attention. A first-month discount or an extended trial is enough to convert the visitors who were already close, without repricing the product for everyone who arrives later.

Also decide when the offer ends and what happens to the people who arrive after it. An offer with no end date becomes the price, and a price you did not plan for is the most expensive thing a launch can leave behind.

Write the offer as a single sentence you can put on the page and in the first comment. If the sentence needs a footnote to be honest, the offer is too complicated for launch day.

What to do the day before

The day before is a checklist day, not a build day. Open the page in preview and click every link. Test signup and payment from a clean browser. Finish the first comment. Schedule the supporter messages. Write reply templates for the three questions you know are coming. Then stop.

A team that ships a new feature the night before is a team that launches a bug, and a bug on launch day is the one thing the audience will remember. Freeze the product, test the path a stranger takes, and go to sleep.

Write down the three things you will not do tomorrow as well: no redesigns, no pricing experiments, no new features. The list is short because the temptation is strong, and the launch is a bad time to find out that a change broke signup.

Launch day, in blocks rather than hours

Morning: publish the post, post the first comment, send the supporter messages. Midday: answer every comment within the hour and fix anything a commenter found broken. Afternoon: share the launch in the communities where you actually participate, with context rather than a bare link. Evening: thank the people who engaged, log the numbers, and stop refreshing.

The numbers that matter on the day are comments and signups, not rank. Rank moves with the algorithm and the hour; comments tell you whether the product landed, and signups tell you whether the page worked. Both are things you can act on, which rank is not.

Keep one document open for the day: what was posted where, what broke, and what people asked. It becomes the case study and the FAQ, and it is the only record that will still make sense a week later.

Do not schedule the community posts in advance for the whole day. Each post should react to what the previous one produced, and a scheduled post cannot do that.

What not to do, and why it costs more than it gains

Do not buy upvotes, do not ask for upvotes in a group chat, do not create accounts, and do not trade votes with another maker. The platform detects the patterns, the penalty is removal, and the removal is public and permanent. The same goes for messaging strangers with a link and a request; it converts almost nobody and it spends the reputation you will want next time.

The honest version of the same effort is a message that says what you built and asks for a look, sent to people who have a reason to care. It is slower, it scales worse, and it does not get your launch removed.

When Product Hunt is not the right launch

Skip it if your buyers are not there. If the product sells to a niche that does not browse launch sites, whether that is local services or enterprise infrastructure or a tool for one specific profession, the day produces a spike of the wrong people, and the follow-up cost is real. Skip it too if the product is not usable end to end, because launch traffic is evaluation traffic and an unfinished product converts nobody.

  • Buyers not on the platform: spend the day on the channel they do use.
  • Not usable end to end: finish the core flow before the launch.
  • Nobody available for comments all day: the launch becomes a monologue.
  • The offer cannot survive the traffic: decide the cap before the day.

A launch on the wrong platform is not neutral. It costs two weeks of preparation and produces a list of signups who will never activate, which is worse than no launch at all because it looks like progress.

The week after: what most teams skip

The week after is where a launch becomes a channel. Follow up with every signup that did not activate, turn the launch assets into permanent ones, including the gallery images as documentation screenshots and the first comment as the About page, and submit to the directories that want a launched product with traction.

Check what a listing will demand of your site before you submit. The library tracks 297 of 1,027 directories that require a badge or a backlink, with 320 badge assets documented, and 967 directories offering a public form. Knowing that up front turns a week of badge requests into a single afternoon of assets.

FAQ

How far in advance should I prepare a launch?

Two weeks is the useful window. It is long enough to build the asset pack, write the first comment, collect a supporter list, and run a clean-browser test of signup and payment. Shorter than that and the launch becomes a scramble that shows in the details; longer than that and the assets start going stale before the day arrives. Put the two weeks on the calendar and work backwards from the date.

Do I need a hunter to launch?

No. Self-hunting is normal and works when the page and the first comment are good. A hunter schedules the post and lends a following, which helps when that following is in your category and does little otherwise. Do not pay for a hunter, and do not trade anything for the introduction. The value is in your own supporter list, because those are the people who will actually read the page.

Can I launch without an audience?

You can, and the result is a smaller spike and a permanent page. The launch itself will not manufacture an audience, so the preparation that matters is the supporter list and the communities where you already participate. If those are empty, spend the two weeks building them rather than preparing a launch that will be seen by nobody. A launch is a multiplier on the audience you already have. Build the list first, then decide whether the launch is worth the week.

What should the first comment say?

Six short paragraphs: what it is, who it is for, why you built it, what is different, what it costs, and what feedback you want. Write it like a person, not a brand, and end with a real question. If there is an honest limitation, name it, because that buys more credibility than another sentence of praise and it invites the replies the platform rewards. That paragraph is also the one journalists and directory editors read first.

How many gallery images do I need?

Five is a good target: the main action, a before and after, the feature people ask about, social proof, and pricing or the offer. Each one should be readable at thumbnail size and captioned with the outcome rather than the feature name. Fewer than three usually means the gallery cannot answer the questions a visitor has before scrolling. More than five rarely gets seen. Each image should answer a question the page cannot answer in text.

Is it against the rules to ask friends to support the launch?

Asking people to look at the launch is fine; asking them to upvote is not, and organizing a group to vote in a short window is the pattern platforms detect and penalize. Send a personal message that explains what you built and invites a look. If the product is interesting, some of them will engage on their own, and that is the only kind of support that counts. A personal message with a reason beats a broadcast with a link.

What time should the post go live?

Follow the platform's own guidance for the day, and prioritize the hours when your supporters can actually see and share the post. Early in the platform's day gives the launch the longest window; late in the day wastes the first hours on a sleeping audience. Check the current guidance the day before, because the platform changes it, and do not rely on a schedule you read months ago. Your supporters' morning matters more than the platform's clock.

What if the launch does not go well?

Separate the two outcomes: the ranking and the signups. A low rank with steady signups means the audience was small but right; a high rank with no signups means the page or the product did not hold. In both cases the assets survive, including the page and the gallery and the first comment, and they keep working in directory listings and search long after the day is forgotten. The assets are the part of the launch you keep.

Should I offer a discount for the launch?

Only a discount you can keep. A first-month reduction or an extended trial converts visitors who were already close without repricing the product permanently. A lifetime deal traded for one day of attention usually costs more in margin than the launch returns, and it sets an expectation that is hard to walk back later. Decide the end date before the offer goes live. A discount that confuses the pricing page costs more than it converts.

How do I prepare for comments I cannot answer?

Write reply templates for the three questions you already know are coming: compatibility, pricing at a specific size, and why signup failed. For anything technical you cannot answer on the spot, say when you will follow up and then actually do it. Public follow-through is rare enough that it reads as competence, which is worth more than a fast but wrong answer. Write the templates the day before, when you are calm.

When should I not launch on the platform?

When your buyers are not there, when the product is not usable end to end, or when nobody on the team can answer comments for the whole day. A launch on the wrong platform produces a spike of the wrong people; a launch of an unfinished product produces refunds and support tickets. Both are worse than waiting two weeks and doing it properly. Waiting is cheaper than repairing a launch that should not have happened.

What should I do with the launch assets afterwards?

Reuse all of them. The gallery images become documentation screenshots, the first comment becomes the About page, the tagline becomes the directory listing copy, and the demo recording becomes the embed on the pricing page. Assets built for a launch are the same assets every directory submission needs, so the two weeks of work keep paying after the day ends. The launch is a moment; the assets are an asset, and assets compound.

One launch day, listings that keep working

Line up the post-launch directory batch in one pass. Start 7 days for $0